Workplaces designed for the people who work in them.
We assess how work is really done, design and install the fixes, and prove the results with before-and-after data. Ergonomics that gets built, not just reported.
Most ergonomics work stops at the report.
Musculoskeletal strain from lifting, reaching, repetition and heat quietly costs plants in lost days, attrition, rework and audit findings. The usual fixes don't close the loop.
Checklists, not change
Audits score the risk and hand over a PDF. Nothing on the line actually changes.
Products without diagnosis
Furniture and equipment get bought without anyone measuring what the job really demands.
No proof it worked
Without re-measurement, nobody can show the plant head, the auditor or the buyer what improved.
Assess. Fix. Prove.
One accountable team from the first walk-through to the final measurement.
Assess.
We measure how the work is really done.
- Walk-through and video task analysis
- Worker discomfort surveys
- Risk scoring: RULA, REBA, NIOSH, OCRA, KIM, ROSA
- Noise, lighting and heat measurement
Fix.
We design the solution, then build and install it.
- Workstation, tool and layout redesign
- CAD drawings and prototypes
- Fabrication and installation through our partner network
- Worker training and SOPs
Prove.
We re-measure the same task with the same people.
- Before-and-after risk scores
- Findings mapped to standards and buyer codes
- ROI case for the next line or site
- Report your auditors can use
From one line to every site.
Ergonomic risk assessment
Plant walk-throughs, task analysis and risk scoring, ranked by severity and cost.
Corrective action plan
Prioritised fixes using the hierarchy of controls, with costs and an ROI case.
Workstation & tool redesign
Fixtures, heights, reaches, trolleys and layouts designed around the task.
Fabrication & installation
We deliver the fix on the floor through vetted fabrication partners.
Ergo champion programme
Train your own people to spot risk early and keep improvements running.
Annual retainer
Ongoing assessments, new-line reviews and compliance support after a successful pilot.
Heat stress programmes
Heat action plans for factories, warehouses, construction and delivery teams.
Safe patient handling
Assessment, equipment and training to reduce handling strain on care staff.
Heftrex products
Stools, sorting tables, sit-stand converters, mats, lift aids and trolleys, designed from our assessments.
Where the heft is heaviest.
Auto & auto components
Line ergonomics, manual handling and OEM supplier requirements.
Warehousing & logistics
Pick-pack stations, lifting, heat and high-repetition tasks.
Electronics manufacturing
Fine assembly, seating and RBA code compliance.
Apparel & textile exporters
Sewing and finishing lines, ready for SMETA, amfori BSCI and WRAP audits.
Hospitals
Safe patient handling for nursing and support staff.
Supply-chain & NGO programmes
Low-cost fixes for informal and home-based workers in brand supply chains.
Dr. Anupriya Chaturvedi
Dr. Anupriya Chaturvedi is a physiotherapist and MBA with 16 years of experience in musculoskeletal health, and has led Health Pro Solutions for the past 7 years, building and running a healthcare services business. She brings a clinician's understanding of how the body responds to physical work (load, posture and repetition) together with an operator's discipline on cost, risk and delivery. She leads Heftrex on one standard: every recommendation must be practical to implement and proven with before-and-after data.
We understand how injuries develop in the body, not just what a checklist flags.
A specialist team and a vetted network of safety engineers, industrial designers and fabrication partners.
Every project ends with before-and-after data on the same task.
From the first walk-through to the final measurement.
One line. 60 days. A measured result.
Pick one line, cell or station where strain is highest. We assess it, fix it and prove the change, so you can judge us on results before scaling.
Fixed scope and fee, agreed upfront. Ask us for a proposal.
- WEEK 1–2Assess: walk-through, video, worker survey, baseline risk scores.
- WEEK 3–4Design: corrective plan, drawings and costs for your sign-off.
- WEEK 5–7Build: fabrication, installation and worker training.
- WEEK 8–9Prove: re-measurement and a before-and-after report.
Tell us about the line that worries you most.
Email us a few lines about the task or line, and we'll arrange a site visit or a call.