Workplaces designed for the people who work in them.

We assess how work is really done, design and install the fixes, and prove the results with before-and-after data. Ergonomics that gets built, not just reported.

Assessment to installation, one team Before-and-after measurement Mapped to standards and buyer codes
The problem

Most ergonomics work stops at the report.

Musculoskeletal strain from lifting, reaching, repetition and heat quietly costs plants in lost days, attrition, rework and audit findings. The usual fixes don't close the loop.

01

Checklists, not change

Audits score the risk and hand over a PDF. Nothing on the line actually changes.

02

Products without diagnosis

Furniture and equipment get bought without anyone measuring what the job really demands.

03

No proof it worked

Without re-measurement, nobody can show the plant head, the auditor or the buyer what improved.

How we work

Assess. Fix. Prove.

One accountable team from the first walk-through to the final measurement.

Assess.

We measure how the work is really done.

  • Walk-through and video task analysis
  • Worker discomfort surveys
  • Risk scoring: RULA, REBA, NIOSH, OCRA, KIM, ROSA
  • Noise, lighting and heat measurement

Fix.

We design the solution, then build and install it.

  • Workstation, tool and layout redesign
  • CAD drawings and prototypes
  • Fabrication and installation through our partner network
  • Worker training and SOPs

Prove.

We re-measure the same task with the same people.

  • Before-and-after risk scores
  • Findings mapped to standards and buyer codes
  • ROI case for the next line or site
  • Report your auditors can use
Services

From one line to every site.

01 · ASSESS

Ergonomic risk assessment

Plant walk-throughs, task analysis and risk scoring, ranked by severity and cost.

02 · PLAN

Corrective action plan

Prioritised fixes using the hierarchy of controls, with costs and an ROI case.

03 · DESIGN

Workstation & tool redesign

Fixtures, heights, reaches, trolleys and layouts designed around the task.

04 · BUILD

Fabrication & installation

We deliver the fix on the floor through vetted fabrication partners.

05 · TRAIN

Ergo champion programme

Train your own people to spot risk early and keep improvements running.

06 · SUSTAIN

Annual retainer

Ongoing assessments, new-line reviews and compliance support after a successful pilot.

07 · HEAT

Heat stress programmes

Heat action plans for factories, warehouses, construction and delivery teams.

08 · HOSPITALS

Safe patient handling

Assessment, equipment and training to reduce handling strain on care staff.

COMING SOON

Heftrex products

Stools, sorting tables, sit-stand converters, mats, lift aids and trolleys, designed from our assessments.

Industries

Where the heft is heaviest.

Auto & auto components

Line ergonomics, manual handling and OEM supplier requirements.

Warehousing & logistics

Pick-pack stations, lifting, heat and high-repetition tasks.

Electronics manufacturing

Fine assembly, seating and RBA code compliance.

Apparel & textile exporters

Sewing and finishing lines, ready for SMETA, amfori BSCI and WRAP audits.

Hospitals

Safe patient handling for nursing and support staff.

Supply-chain & NGO programmes

Low-cost fixes for informal and home-based workers in brand supply chains.

Dr. Anupriya Chaturvedi, Chief Executive Officer, Heftrex
Leadership

Dr. Anupriya Chaturvedi

Chief Executive OfficerPhysiotherapist · MBA16 years in musculoskeletal health

Dr. Anupriya Chaturvedi is a physiotherapist and MBA with 16 years of experience in musculoskeletal health, and has led Health Pro Solutions for the past 7 years, building and running a healthcare services business. She brings a clinician's understanding of how the body responds to physical work (load, posture and repetition) together with an operator's discipline on cost, risk and delivery. She leads Heftrex on one standard: every recommendation must be practical to implement and proven with before-and-after data.

Clinical depth

We understand how injuries develop in the body, not just what a checklist flags.

Design and build

A specialist team and a vetted network of safety engineers, industrial designers and fabrication partners.

Measured outcomes

Every project ends with before-and-after data on the same task.

One point of accountability

From the first walk-through to the final measurement.

Start here

One line. 60 days. A measured result.

Pick one line, cell or station where strain is highest. We assess it, fix it and prove the change, so you can judge us on results before scaling.

Fixed scope and fee, agreed upfront. Ask us for a proposal.

  1. WEEK 1–2Assess: walk-through, video, worker survey, baseline risk scores.
  2. WEEK 3–4Design: corrective plan, drawings and costs for your sign-off.
  3. WEEK 5–7Build: fabrication, installation and worker training.
  4. WEEK 8–9Prove: re-measurement and a before-and-after report.
Contact

Tell us about the line that worries you most.

Email us a few lines about the task or line, and we'll arrange a site visit or a call.